Refurbishment Diary
Opal — Internal Refurbishment
Opal's cabin is being taken back to the hull and rebuilt from the floor up. This page follows the work as it happens.
Where we're heading
The Objective
This is the plan we're working to: a new cabin layout between the galley and the aft deck, built around a superking bed.

Tap the plan to open it full size.
- ✓Superking bed (1800 × 2000) built over the two water tanks
- ✓Two wardrobes and a dressing area at the forward end
- ✓Bedside units with 240V and 12V sockets and heater outlets
- ✓Eaves-height cupboards along the port side, plus a floor-to-ceiling cupboard
- ✓LED strip lighting under the bed edge
- ✓A clear walkway from the galley to the aft door
Stage 1 — The initial stage
Strip-out, new stringers and a new floor
The first job was to strip the cabin right back. The old berths and panelling came out, exposing the two water tanks and the floor beneath.
Lifting the floor showed the real problem: the stringers underneath had rotted. There was no sense building a new cabin on a rotten base, so they were replaced and fibreglassed over.
With a sound structure back in place, the new floor has gone down. The bed is now being made over the water tanks and the wardrobe is coming together.














Photo 1 of 14
Strip-out begins
The old berths and panelling start to come out of the cabin.
Stage 2 — The new water tank
From flat sheet to 600-litre tank
The strip-out uncovered rotten stringers under Opal's old water tanks, and we decided to replace the two tanks with one brand-new tank in 316 marine-grade stainless. This week it has been built, and it's a thing of beauty.
The goal: one 600-litre tank that fits under the new bed base, built to last, with no more slow leaks rotting the boat from underneath.
It started as flat sheets of 316 stainless on the bench. The 2.5 mm sheet was chosen so the welds stay clean and the panels don't warp. Each panel was cut to size, then the sides were tacked together into one big box.
The clever bit is inside. The plates running across the tank are baffles. Without them, 600 litres of water would slosh from end to end every time we turned or hit some wash, putting a lot of strain on the tank. The cut-off corners let the water move through slowly, so it settles rather than surges.
Then the moment of truth. With the lid welded on and the fittings in, the tank was pressure-tested at 5 psi for 30 minutes. It passed, and it holds 601.4 litres.
Still to come: getting the tank aboard and into its new home under the bed. Then it's plumbing it in, fixing the rubbing strake leak, and fitting the cameras under the floor before it's all closed up.






Photo 1 of 6
Flat sheet on the bench
It starts as flat sheets of 316 stainless on the workshop bench, with the first cut panels standing behind.
The work is ongoing. More photos will be added here as each stage is completed.